Before You Begin
Inspect the item(s):
Photograph any damage that may have occurred during shipping.
Note any damage on the delivery receipt before signing for the shipment. If there is extensive visible damage to the machine, refuse to accept the shipment.
Verify the received goods against the packing list.
If there is any damage or shortages, you must contact Tormach within 30 days of receipt. Create a support ticket with Tormach Technical Support at tormach.com/how-to-submit-a-support-ticket for guidance on how to proceed.
If there are any items that have not yet been delivered, we recommend waiting until you've received all shipments to begin installing the machine. Depending on the product and options ordered, the system may arrive in one or more shipments of:
Accessories (if applicable)
Machine
NOTE: The machine system and large accessories are sent by freight carrier. Smaller accessories may be sent by parcel service.
Packing List
The following items are included with your 24R (PN 39532):
24R Machine Owner's Kit (PN 39534)
CW3000 Chiller (PN 35161)
Chiller Alarm Cable (PN 50381)
Tormach Tool Bag
The Tormach tool bag contains the following tools and items:
6 mm Vacuum Gasket (PN 50362), 6 m
18 mm - 21 mm Wrench (PN 50358)
30 mm - 27 mm Wrench (PN 50357)
Adjustable Wrench (PN 50359)
Dust Shoe Assembly (PN 50625)
ER20 Collet Nut
Grease Gun (PN 50360)
Metric Hex Wrench Set (PN 50361)
Operator box
The machine owner's kit contains the following items:
Black nylon cable tie, 4
Controller/Monitor Cable (PN 39042), 3
Ethernet Cable (PN 50383), 2000 mm
Grease Nozzle Kit (PN 50389)
M5 × 25 mm screw, 4
M5 nut, 4
Operator Box Drill Template (TD10713)
Operator's Manual (PN 39535)
Installation Tools and Items
Before uncrating and installing your machine, collect the following tools and items.
2 in. × 6 in. × 8 in. board, 40
4 in. × 4 in. × 6 ft visual grade #2 (or higher) board, 2
#5 drill bit
Combination wrenches:
18 mm - 21 mm combination wrench (provided in the tool bag)
30 mm - 27 mm combination wrench (provided in the tool bag)
Carpenter's level
Dead-blow hammer (or similar)
Distilled water
Drill
Ladder (optional)
Metric hex wrench set (provided in the tool bag)
Pallet jack
Phillips screwdriver
Pry bar
Safety eyewear that meets ANSI Z87+
Snips
Socket wrench and an 8 mm (5/16 in.) socket
Tape
Work gloves
Wrenches:
8 mm wrench
16 mm wrench
21 mm wrench
22 mm wrench
24 mm wrench
Adjustable wrench (provided in the tool bag)
Move the Pallet
Tools and Items Required
Pallet jack
Shipments arrive in crates loaded on pallets, which the freight carrier unloads onto the curb or loading dock.
WARNING! Transportation and Lift Hazard: Before moving the machine, you must confirm that all persons are clear of the area below the machine. Qualified professionals must transport, lift, and move the machine. Moving parts can entangle, pinch, or cut you, causing death or serious injury.
Verify that the ground surface is smooth and clean of debris, and then use a pallet jack to move the pallet(s) to the desired installation location.
NOTE: If the ground is not smooth, you may need to use a forklift (or similar lifting equipment rated for uneven surfaces) to move the pallet(s).
Looking for more information?
This is a section of the 24R operator's manual. To view the whole manual, go to Tormach document UM10564.
If you have additional questions, we can help. Create a support ticket with Tormach Technical Support at tormach.com/how-to-submit-a-support-ticket for guidance on how to proceed.